Arado Ar 234B Nachtigall 1/72 Scale Plastic Model Kit Dragon 5012

Save 25%

Price:
Sale price$ 29.99 CAD Regular price$ 39.99 CAD

Description

he Arado Ar 234 Blitz is a jet-powered bomber designed and produced by the German aircraft manufacturer Arado. It was the world's first operational turbojet-powered bomber, seeing service during the final years of the Second World War.
Development of the Ar 234 can be traced back to the latter half of 1940 and the request to tender from the Ministry of Aviation to produce a jet-powered high-speed reconnaissance aircraft. Arado was the only respondent with their E.370 design. While its range was beneath that of the Ministry's specification, an initial order for two prototypes was promptly issued to the company, designated Ar 234. While both of the prototypes had been mostly completed prior to the end of 1941, the Junkers Jumo 004 turbojet engines were not available prior to February 1943. Due to engine unreliability, the maiden flight of the Ar 234 V1 was delayed until 30 July 1943. In addition to the original reconnaissance-orientated Ar 234A, the fast bomber Ar 234B model was developed in response to a request by the Ministry of Aviation. Due to a lack of internal space in the relatively slender fuselage, bombloads of up to 1,500 kg (3,300 lb) had to be carried on external racks rather than in internal bomb bays.
The Ar 234 was produced only in small numbers, despite plans for production of 500 per month in late 1945. This was partly due to a lack of available jet engines and other critical materials, for which the aircraft had to compete with other types, such as the Messerschmitt Me 262. Several models were proposed, with alternative engines, cockpit improvements, and adaptations for other roles, including as a night fighter. In late 1944, aerial reconnaissance missions over enemy territory commenced. The Ar 234 was almost entirely used to perform such reconnaissance missions and it was in this capacity that it became the last Luftwaffe aircraft to overfly the United Kingdom during the war, in April 1945. In its capacity as a bomber, the most prominent use of the Ar 234 was the repeated attempts to destroy the Ludendorff Bridge at Remagen between 7 and 17 March 1945. Many airframes were destroyed or captured on the ground due to a lack of serviceable engines or fuel.


Payment & Security

American Express Apple Pay Diners Club Discover Google Pay Mastercard PayPal Shop Pay Visa

Your payment information is processed securely. We do not store credit card details nor have access to your credit card information.

You may also like

Recently viewed